We have been blessed with some great weather this week helping us to put up the windbreak mesh. Some gentle breezes made the job a challenge at times, but almost complete. Just need to order 17 more metres of material and finish off with cable ties.
Wednesday, 15 October 2014
Wednesday, 17 September 2014
Fencing Nearing Completion
We are delighted with the work of our fencer William Montgomery who has done a first class job of our stock fencing throughout the site including the installation of several gates and the construction of a bridge over the stream. We would have no hesitation in recommending William for fencing and many other tasks including;
Contact William Montgomery, Upper Carlstoun Farm,
Acre Valley Road, Torrance, G64 4DL
Email: williammongomery@btinternet.com
Tel (Evenings): 01360 620 038
Mobile: 07900 638 105
- Tree Felling, Reduction & Removal
- Stump Griding
- Log Splitting
- Hedge Trimming
- Fencing
- Grass Cutting
- Turfing
- Weed Control
- Snow Clearing
Contact William Montgomery, Upper Carlstoun Farm,
Acre Valley Road, Torrance, G64 4DL
Email: williammongomery@btinternet.com
Tel (Evenings): 01360 620 038
Mobile: 07900 638 105
Friday, 5 September 2014
Knapweed (Centaurea)
The Foragers farm is situated on an old wildflower meadow. Because biodiversity is paramount to the success of our culinary herb crops, we are protecting and further establishing the diverse flora and fauna found here. One of our favourites is Knapweed (Centaurea). It looks like a thistle and is most loved by pollinating insects, especially bees, flies, butterflies and beetles. The seed heads attract goldfinches and other seed-feeding birds. Anyone can grow this from seed at anytime of the year. Great for any garden.
Thursday, 7 August 2014
Polytunnels Erected
The team from Premier Polytunnels were up this week to erect our two 30 x 60ft tunnels. We are delighted with them. Next challenge will be building raised beds and sorting out irrigation.
Labels:
construction,
polytunnels,
progress
Sunday, 25 May 2014
Mobile homes arrive on site
Following completion of the barn and connection of the services, the next stage is delivery of our mobile homes. In order to establish and operate Foragers effectively it's imperative that we live on site, so the McAlpine family is all set to downsize and move to Wester Balfunning Farm very soon. A great opportunity to get rid of all the accumulated and often unnecessary junk we have gathered over the years. A few trips to charity shops and recycling centres will be required I think.
![]() |
| I really hope that gate's wide enough! (watch this video to find out) |
![]() |
| Well done McCallum's Caravans - great job! |
Labels:
construction,
mobile homes,
news,
progress
Saturday, 17 May 2014
Water, Gas and Electricity
It’s been a hectic few weeks on site with all the main services now connected. Some utility companies do generate excessive red tape though!
![]() |
| Traffic management for water connection. |
![]() |
| Digging up the road to access the water main. |
![]() |
| Domestic and commercial water supply |
![]() |
| "The boys from the black stuff" get the road repaired |
![]() |
| LPG supply to mobile homes |
![]() |
| Gas pipes pressure testing |
![]() |
| Cable arrives for electric supply |
![]() |
| Splicing the electricity cable |
![]() |
| Connecting the electricity cable |
Labels:
construction,
electricity,
gas,
progress,
services,
water
Thursday, 8 May 2014
Barn complete
Our barn is now complete. The floor will never be this tidy again.
![]() |
| Some of the hard working team from Robinsons. Thanks Artur and Rastick! |
![]() |
| Newly laid topsoil over area where polytunnels will be erected July/August |
| Inside looking towards roller shutter |
![]() |
| Inside looking towards dividing wall to cider house |
![]() |
| What will be the cider house |