The team from Premier Polytunnels were up this week to erect our two 30 x 60ft tunnels. We are delighted with them. Next challenge will be building raised beds and sorting out irrigation.
Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
Thursday, 7 August 2014
Polytunnels Erected
Labels:
construction,
polytunnels,
progress
Sunday, 25 May 2014
Mobile homes arrive on site
Following completion of the barn and connection of the services, the next stage is delivery of our mobile homes. In order to establish and operate Foragers effectively it's imperative that we live on site, so the McAlpine family is all set to downsize and move to Wester Balfunning Farm very soon. A great opportunity to get rid of all the accumulated and often unnecessary junk we have gathered over the years. A few trips to charity shops and recycling centres will be required I think.
![]() |
| I really hope that gate's wide enough! (watch this video to find out) |
![]() |
| Well done McCallum's Caravans - great job! |
Labels:
construction,
mobile homes,
news,
progress
Saturday, 17 May 2014
Water, Gas and Electricity
It’s been a hectic few weeks on site with all the main services now connected. Some utility companies do generate excessive red tape though!
![]() |
| Traffic management for water connection. |
![]() |
| Digging up the road to access the water main. |
![]() |
| Domestic and commercial water supply |
![]() |
| "The boys from the black stuff" get the road repaired |
![]() |
| LPG supply to mobile homes |
![]() |
| Gas pipes pressure testing |
![]() |
| Cable arrives for electric supply |
![]() |
| Splicing the electricity cable |
![]() |
| Connecting the electricity cable |
Labels:
construction,
electricity,
gas,
progress,
services,
water
Thursday, 8 May 2014
Barn complete
Our barn is now complete. The floor will never be this tidy again.
![]() |
| Some of the hard working team from Robinsons. Thanks Artur and Rastick! |
![]() |
| Newly laid topsoil over area where polytunnels will be erected July/August |
| Inside looking towards roller shutter |
![]() |
| Inside looking towards dividing wall to cider house |
![]() |
| What will be the cider house |
Labels:
barn,
cider house,
ciderhouse,
construction,
progress
Thursday, 1 May 2014
Almost wind and water tight
Our barn is nearing completion. Concrete floor, castle boarding and doors installed this week by Robinsons Scotland Ltd.
| Timber cladding and doors being installed |
| The concrete floor being poured |
Labels:
barn,
cider house,
construction,
progress
Monday, 27 January 2014
Construction starts at Wester Balfunning
Drew Graham Contracting Ltd. arrived on site today to get the project started. Here's hoping for a spell of dryer weather to help us get the groundworks completed asap.